Project: Falcon Sports & Community Centre
Value: £3,400,000
Role:  Main Contractor (Design & Build)
Period: 52 weeks

Overview
Here appointed to work on this extensive project as the principal design and build contractor. This involved building and developing a fully-functional sports and community centre, over a period of 52 weeks.

Brief
HSDev’s brief was to design and construct a sports and community centre incorporating the following:

  • Sports hall
  • Back of house changing room facilities
  • Front of house crèche area
  • Manager’s office
  • Meeting room
  • WC facilities

The project also involved construction of an all-weather sports pitch, external sports pitches and all associated landscaping and land drainage for the external sports pitches.

Challenges Overcome

  • Dealing with a multi headed Client
  • Integrating sustainable means of construction for the building using sola-ventilation systems.

Key Accomplishments

  • The new build has benefited the local community enormously, providing them with a well-equipped building where they can engage in numerous sports, both indoor and outdoor
  • The community have a central meeting point at which they can participate in different physical activities, meet like-minded individuals, fundraise for the benefit of the wider community and engage the youth in sports and the arts
  • Potential for facility to be used for commercial purposes, as a private venue to hire for events and meetings
  • Building constructed within approved client budget.
© Copyright 2014 H.S. Dev & Co Ltd Building Contractors | Powered By: TSDesigns.co.uk